Find Scaffolding Tube And Coupler, Scaffolding, Iron Pipe & Tube on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
aluminium scaffold tube
Home > Products > Scaffolding Tube and Coupler > aluminium scaffold tube

aluminium scaffold tube

    Packaging: Our galvanized ERW tube can be packed in bundle, suitable for sea shipment
    Place of Origin: Tianjin, China (Mainland)

Product Description

Hot dipped Galvanized/pre galvanized ERW steel pipe

 

Specification

1.Product name: galvanized ERW pipe

2.Outer diameter: 21.3mm-406.4mm
3.Wall thickness:0.6mm-20.0mm
4.Length:0.3-12m
5.Zn coating mass:275-600g/m2
6.Material:Q235B,Q345B,S235JR,S355JR,STK400,STK500
7.Tolerence: 8%
8.Surface finish: hot dipped galvanized, electro galvanized, black, painted, engraved

9.Standard:BS1139-1990,EN39-2001,JIS G3444:2004
10.Port of loading: Tianjin
11.Samples are available
12.ISO 9001-2000 approved.
13.Performance:good bearing capacity,durable & stable
14.Test: SGS, BV or as per your request
15.Produced in our own factory,can control the zinc thickness much better
16.OEM service is available.

 

High tensile galvanized ERW pips are designed for tubes&coupler Scaffolding.The tubes have hot-dipped

galvanized surfaces finish so as to provide excellent appearance with sufficient durability in such

applications where salty air or long-term weather exposures are inevitable.

 

Standard Size

Outer Diameter Wall Thickness Length
Inch mm mm 0.3-12
1/2'' 21.3 0.6-3.0 0.3-12
3/4'' 26.9 0.6-3.0 0.3-12
1'' 33.4 1.0-3.0 0.3-12
1-1/4'' 42.3 1.0-4.0 0.3-12
1-1/2'' 48.3 1.0-4.0 0.3-12
2'' 60.3 1.5-4.0 0.3-12
2-1/2'' 76.1 1.5-4.0 0.3-12
3'' 88.9 1.5-9.5 0.3-12
4'' 114.3 2.0-9.5 0.3-12
5'' 141.3 3.0-9.5 0.3-12
6'' 168.3 3.0-12.0 1.0-12
8'' 219.1 3.2-12.0 1.0-12
10'' 273 3.2-12.0 1.0-12
12'' 323.8 6.0-15.0 1.0-12
14'' 355.6 8.0-15.0 1.0-12
16'' 406.4 8.0-20.0 1.0-12

 

 

Why Us:

 

Xiangjia Steel is  a leading manufacturer of galvanized ERW pipe, system scaffoldings and accessories,

galvanized steel tube,Frames,steel props, metal planks and other related products.

 

• 7 years experience, sales volume reaches 1.5 billion US dollars.
• Good quality control in production process, ISO9001:2008,SGS,BV approved.
• Excellent quality and Competitive price, OEM is available.
• Available in an extensive range of stock or custom size.
• The whole process from material to finished products can be traced.
• Our factory is close to the port-Xingang,Tianjin.  

 

Factory Show

 

 

 

Certification

 

 

Trade Terms:
• Payment:  T/T 30%  in advance, balance against copy of B/L,Western Union, L/C etc.
• Production Lead Time: 15- 40days after deposit paid.
• Shipping Methods: Oean carriage.
• FOB Shipping Port: Tianjin, Shanghai, China.
• FOB/CIF/CNF term available

 

Quality control

 

 

 

Trade Show

 

 

 

We also Supply:
Galvanized ERW pipe, Ringlock Scaffolding System, Adjustable steel props, Adjustable screw jack,

Frame system, Metal plank, Scaffolding coupler& accessories, Suplock scaffolding system etc.

 

For more detals please contact us freely ^______^

 

 

Product Categories : Scaffolding Tube and Coupler