240*45mm pregalvanized/HDG metal board clip for construction made in China
Packaging: | In bulk or 100 pcs per bundle or as your request. |
---|---|
Brand: | ADTO |
Place of Origin: | Tianjin, China (Mainland) |
Basic Info
Model No.: 210/240/250/300mm
Product Description
240mm Pregalvanized Scaffolding steel walking board
Size (mm) | Weight (kg/pc) | Size (mm) | Weight (kg/pc) |
WALK BOARDS | CATWALK | ||
210 x 45 x 1.2 x 4000 | 13.60 | 500 x 50 x 1.2 x 1829 | 15.50 |
210 x 45 x 1.2 x 3000 | 10.26 | 480 x 45 x 1.2 x 1829 | 13.50 |
210 x 45 x 1.2 x 2000 | 6.93 | 450 x 45 x 1.2 x 1829 | 13.00 |
210 x 45 x 1.2 x 1000 | 3.59 | 450 x 38 x 1.2 x 1829 | 12.50 |
240 x 45 x 1.2 x 4000 | 14.87 | 420 x 45 x 1.2 x 1829 | 12.50 |
240 x 45 x 1.2 x 3000 | 11.23 | 500 x 50 x 1.2 x 1219 | 11.00 |
240 x 45 x 1.2 x 2000 | 7.59 | 480 x 45 x 1.2 x 1219 | 10.00 |
240 x 45 x 1.2 x 1000 | 3.94 | 450 x 45 x 1.2 x 1219 | 9.50 |
250 x 50 x 1.2 x 4000 | 15.67 | 450 x 38 x 1.2 x 1219 | 9.00 |
250 x 50 x 1.2 x 3000 | 11.84 | 420 x 45 x 1.2 x 1219 | 9.00 |
250 x 50 x 1.2 x 2000 | 8.00 | 330 x 50 x 1.2 x 1829 | 11.50 |
250 x 50 x 1.2 x 1000 | 4.15 | 330 x 50 x 1.2 x 1219 | 8.50 |
THE ADVANTAGES OF OUR METAL SCAFFOLDING PLANK
- A larger capacity
When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to 15kN ~ 35kN (1.5tf ~ 3.5tf, design value).
- Easy disassembly, erection and flexible
Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.
- To compare the economy
Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.
PICTURES OF SCAFFOLDING METAL BOARD:
WAREHOUSE OF SCAFFOLDING METAL BOARD
1. Q: What's your MOQ(minimum order quantity)?
A: One full container.
2. Q: What's your packing methods?
A: Packed into bundle, and rest in bulk.
3. Q: What's your payment terms?
A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.
4. Q: What's your delivery time?
A: 10-20 days after received the advance payment or L/C.
5. Q: Are you manufacturer or trader?
A: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.
6. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.
7. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Q: Can you supply other scaffolding materials?
A: Yes. All related scaffolding materials.
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped Galvanized/ black. BS1139
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler)
(5) steel plank with hooks or without hooks
(6) steel stair case
(7) screw adjustable base jack
(8) Adjustable props
Product Categories : Ungrouped